Power Line Finished Product Inspection Rules

Double the quantity should be taken. The unqualified item should be re-examined. The sample is tested for unqualified power cord components. The power cord assembly is prepared before production. The sampling batch is specified as one sample per 20km power line product. If it is still unqualified Perform a 100% inspection of the power cord assembly. Leading the various specifications of insulated cores, the operation requires power cord components. Prevent the core from being loose and tangled on the cable machine. Three or four different color spools are respectively installed on the power cord assembly of the cable plug of the cable machine. 

The cabled cores are put together through the shaft hole of the cable-forming machine to form a cable. The conductor is cut off halfway and the wire must be even and even during operation, and maintain a certain amount of tension. Clear production tasks to remove obstacles around the cable machine. The take-up reel is loaded onto the shaft at the take-up position. 1 power cord assembly. 1 The operator must be familiar with the outer diameter of the insulated core of various specifications. It should be checked before the cable pitch is correct. The size of the structure, after the cable is connected to the power cord, the insulation should be stripped off, and the pitch power line assembly should be changed according to the requirements of the process card.